Document | Added |
---|---|
Transcript of telephone call Mrs. Smith (25.03.2005)
1 Pages |
23.01.2025 |
22.03.2005 | Mrs. Smith made a telephone call |
Due to the necessary rebuilding of the first 500 floors we are in need of stone deposition sites for temporarily shelving stones with wrong dimensions.
Babel Tower Coorporation
Department of Stone Measurement (DOFSTON)